| ![](../../../figure/gaw_stations.gif)
Assekrem
-O3-
Observation |
Category |
: |
Air sampling observation |
Situation |
: |
ongoing |
Time zone |
: |
UTC |
Sampling |
Sampling height |
: |
+3 |
Description |
: |
continuous |
Sampling and analysis frequency |
: |
Continuous |
Sampling environment |
: |
The measure are take at the remote site of Assekrem , 50 km north of the city of Tamanrasset. The site of assekrem is entoured by mountains ans his altitude is 2710 m above the the sea.
|
Description for sampling analysis |
: |
an air intake at 3 m above the ground. |
Instrument and Analysis |
Measurement method |
: |
Light absorption analysis (UV) |
Current status and history of instrument |
: |
UV Photometry |
Description of instrument |
: |
TECO
TECO 49
Teco 49C since may 2005 |
Calibration |
Current scale employed in the measurement |
: |
|
Measurement calibration |
: |
|
Scale and calibration(treasability) |
: |
The calibration of teco 49 C is done regulary each 03 to 4 years by the laboratory EMPA (swiss). The last calibration was made in may2007. |
Data Processing |
Measurement unit |
: |
ppb |
Data processing |
: |
|
Processing for averaging |
: |
Processing for Hourly Data: The processing on hourly ,daily,monthy are done by the software DANDI given by the laboratory swiss EMPA in november 2007 Processing for Daily Data: The same like hourly data Processing for Monthly Data: the same like hourly data |
Data flag |
: |
|
Data remarks |
: |
|
Other Information |
Scientific aim |
: |
|
Reference |
: |
|
|
submitted by Office National de la Meteorologie |
|
|