No.8

Introduction
Data Policy
Data
Documentation
Contact Information



Assekrem

-O3-

back
Station Contact Person(s) Observation Data and Quick Plot

Observation
Category : Air sampling observation
Situation : ongoing
Time zone : UTC


Sampling
Sampling height : +3
Description : continuous
Sampling and analysis frequency : Continuous
Sampling environment : The measure are take at the remote site of Assekrem , 50 km north of the city of Tamanrasset. The site of assekrem is entoured by mountains ans his altitude is 2710 m above the the sea.

Description for sampling analysis : an air intake at 3 m above the ground.


Instrument and Analysis
Measurement method : Light absorption analysis (UV)
Current status and history of instrument : UV Photometry
Description of instrument : TECO
TECO 49
Teco 49C since may 2005


Calibration
Current scale employed in the measurement :
Measurement calibration :
Scale and calibration(treasability) : The calibration of teco 49 C is done regulary each 03 to 4 years by the laboratory EMPA (swiss). The last calibration was made in may2007.


Data Processing
Measurement unit : ppb
Data processing :
Processing for averaging : Processing for Hourly Data:
The processing on hourly ,daily,monthy are done by the software DANDI given by the laboratory swiss EMPA in november 2007
Processing for Daily Data:
The same like hourly data
Processing for Monthly Data:
the same like hourly data
Data flag :
Data remarks :


Other Information
Scientific aim :
Reference :


submitted by Office National de la Meteorologie



The WDCGG is operated by the Japan Meteorological Agency
in collaboration with the World Meteorological Organization